In this project Bathroom Radiator and Heated Towel Rails are powder coated.
- Firstly, they are loaded to an automatic conveyor line by personnel.
- Secondly, products go through spray pre-treatment tunnel for cleaning.
- Thirdly, products go into a drying oven before they arrive to powder coating cabin.
- Later, products come inside the powder coating booth and painted manually by coating personnel.
- After products are powder coated they arrive into the powder curing oven, which they are heated to the desirable curing temperature for the powder coating type that is used.
- Products arrive to the unloading area, which they are unloaded by the personnel manually.